Increase Flexibility — Reduce Set-Up Times and Improve Production Flow
What is Setup Reduction?
Setup Reduction builds on the principles
of the Single Minute Exchange of Dies (SMED) system, developed by Shigeo Shingo, to dramatically reduce or eliminate changeover time.
The four-step Changeover Improvement Process is used to help companies design no/low cost solutions to reduce changeover time. This,
in turn, allows the firm to meet customer demands for high-quality, low-cost products, delivered quickly and without the expense of
excess inventory.
Benefits
Successes
By empowering
operators to reduce make-ready time and increase run speed, a printing and publishing company decreased setup time by 30%
A transportation
equipment manufacturer implemented Total Productive Maintenance, 5-S, and Cellular Flow Manufacturing approaches to its processes.
As a result, setup time fell from 480 hours to 0 hours.
To learn more, call us at 800.MEP.4MFG (800.637.4634) or 304.293.3800, or contact us.